Difference between revisions of "To Do For The New House"

From wikikotten
Jump to: navigation, search
 
Line 33: Line 33:
 
* Box in Mazout Tank
 
* Box in Mazout Tank
 
* Box in buderus + electricity
 
* Box in buderus + electricity
 +
 +
* Paint living, eetkamer, hall
 +
 +
* Coat/shoe cupboard
 +
* Fix and finish ceiling near stairs
 +
* Decorate downstairs toilet
 +
* Sink for downstairs toilet
 +
 +
* Sink for outside
 +
 +
* Paint upstairs

Latest revision as of 07:37, 16 June 2007

Buiten

  • check flat roof above kitchen
  • Schapenstal Asbest
  • Remove dog Fence
  • Clear up garden in front of Stables, Next to drive
  • Fix broken roof open stable
  • Fix roof tiles main stable
  • Fix Metal fence front
  • straighten fence outside
  • Bamboo
  • ivy


Binnen

  • plaster Master bedroom
  • Floor Master Bedroom
  • ceiling Master Bedroom
  • Move Washing to stable
  • stairs to bathroom
  • Bathroom
  • window front room
  • Skirting boards everywhere upstairs
  • Vensterbanken upstairs


  • Box in Mazout Tank
  • Box in buderus + electricity
  • Paint living, eetkamer, hall
  • Coat/shoe cupboard
  • Fix and finish ceiling near stairs
  • Decorate downstairs toilet
  • Sink for downstairs toilet
  • Sink for outside
  • Paint upstairs